The Crown is a doubly curved cantilever shell stage implementing an updated Zollinger system. 

The traditional Zollinger system allows to build large span structures with short pieces but is limited to single curvature, whereas in our design the system replaces the joint with a rigid custom folded plate simplifying both the manufacturing and the assembly.

The Crown

 

Team Gerard Bertomeu, Enrique Soriano, Pep Tornabell, Marc Serra, Quim Escoda, Miquel Benedicto

Client IAAC - MWC SPACE

Project Direction Vicente Guallart, Daniel Ibáñez

Executive Manager Laia Pifarré

General Coordination César Tomé

Initial Conceptual Development Suwapat Rodprasert, Pongpol Punjawaytegul

MAEB Students Austin Gregory Brown, Basant Abdelrahman, Carla Susana Alvear Arízaga, Jacek Antoni Kostrzewa, Jackie Williams, Julia Aurora Guzman Conde, Larsen Bidstrup, Raffaele Schiavello, Ruhani Adlakha, Sneham Pandey, Mariano, Rodriguez Alonso, Sadegh, (Ata) Raoufi Fard, Charles Louis Roger Casbolt, Aishwarya, Shyam Balsekar, Disha Arora, Indraneel Ravindra Joshi, Laila Nabulsi, Nicolas Rotta, Nishanth Maheshwaran, Pradyumna Lalit Vikharankar, Prati Mahavir Jain, Rujuta Chauhan, Shruti Sahasrabudhe, Santwana Malakar

Fabrication Bruno Ganem, Lorenzo Salinas

Timber Alberch

PhotoCredit Adrià Goula

Date 23/03/2023

Previous
Previous

Montjuïc

Next
Next

Castellers